Six-Story Residential Building in London

Focus: BIM/MEP DD+CD (for engineers)
Challenges:

Model a six-story residential building following PTE standards.

Scope of Work:

Transform a set of DWG plans, sections, and elevations into a Revit model file. Include both interior and exterior elements.

Results:

Achieved outstanding success in implementing BIM.

Apartment Tower in Phoenix

Focus: BIM/MEP Coordination

Challenges: 

The project consists on a 24 story, mixed used building located. In downtown Phoenix, Arizona.

The building has 7,613 sqft of retail space 119,508 sqft pf parking and 212,105 sqft of apartments.

Scope of Work:
Creating the BIM Execution Plan.
Modeling MEP trades to LOD 350 for coordination.
Running and managing BIM Coordination Meetings with MEP sub contractors and reporting back to the General Contractor.
Creating Installation 2D Drawings and Sleeve
Drawings of all MEP trades.
Results:
Utilized BIM technology for efficient MEP coordination.
Ensured accurate and clash-free integration of mechanical, electrical, and plumbing systems.
Enhanced collaboration among stakeholders with real-time updates and shared models.
Improved project timelines by detecting and resolving conflicts early in the design phase.
Delivered a high-quality, coordinated MEP system aligned with architectural and structural elements.

The Vandewater

Focus: MEP Coordination

Challenges: 

The Vandewater project in New York City, NY, required seamless MEP (Mechanical, Electrical, Plumbing) coordination within a complex architectural and structural framework.

Results:
Utilized BIM technology for efficient MEP coordination.
Ensured accurate and clash-free integration of mechanical, electrical, and plumbing systems.
Enhanced collaboration among stakeholders with real-time updates and shared models.
Improved project timelines by detecting and resolving conflicts early in the design phase.
Delivered a high-quality, coordinated MEP system aligned with architectural and structural elements.