Apartment Tower in Phoenix

Focus: BIM/MEP Coordination

Challenges: 

The project consists on a 24 story, mixed used building located. In downtown Phoenix, Arizona.

The building has 7,613 sqft of retail space 119,508 sqft pf parking and 212,105 sqft of apartments.

Scope of Work:

  • Creating the BIM Execution Plan.
  • Modeling MEP trades to LOD 350 for coordination.
  • Running and managing BIM Coordination Meetings with MEP sub contractors and reporting back to the General Contractor.
  • Creating Installation 2D Drawings and Sleeve
  • Drawings of all MEP trades.

Results:

  • Utilized BIM technology for efficient MEP coordination.
  • Ensured accurate and clash-free integration of mechanical, electrical, and plumbing systems.
  • Enhanced collaboration among stakeholders with real-time updates and shared models.
  • Improved project timelines by detecting and resolving conflicts early in the design phase.
  • Delivered a high-quality, coordinated MEP system aligned with architectural and structural elements.

Related Posts