Jackson Memorial Hospital

Focus: Reality Capture + Digital Construction (VDC + MEP/FP Modeling)

Challenges: 

Jackson Hospital had a need to renovate their Central Sterile Services Building. With actively used space, speed is a must. Our working hours were reduced to half time.

Scope of Work:

Specialized equipment was utilized to survey above-ceiling systems across 100,000 sqft in various areas. The work was conducted during after-hours (4-5 hours per night over 5 nights). To expedite the process, our team deployed 3 scanners simultaneously. In addition to the survey, we provided LOD 350 BIM modeling and coordination for mechanical systems, along with the preparation of installation drawings.

Results:

  • Full color HD Point Clouds in RCS and LGS format.
  • LOD 350 Revit MEP Models.
  • Views/Sheets creation in Revit PDF.