Focus: BIM
Challenges:
The project involved eliminating level crossings, which posed significant traffic congestion and safety risks.
Scope of Work:
The scope included work on four stations: Murrumbeena, Noble Park, Carnegie, and Clayton. Detailed construction drawings and scaled designs were prepared for each station. The level crossings were elevated to create bridges over the main arterial roads, enhancing traffic flow and safety. Additionally, service buildings supporting the operations of each station were designed and integrated into the project.